Please use this identifier to cite or link to this item: http://earsiv.odu.edu.tr:8080/xmlui/handle/11489/5124
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKafali, Mustafa-
dc.contributor.authorAydin, Nezir-
dc.contributor.authorGenc, Yusuf-
dc.contributor.authorCelebi, Ugur Bugra-
dc.date.accessioned2024-03-26T06:37:56Z-
dc.date.available2024-03-26T06:37:56Z-
dc.date.issued2022-
dc.identifier.citationKafali, M., Aydin, N., Genç, Y., Çelebi, UB. (2022). A two-stage stochastic model for workforce capacity requirement in shipbuilding. J. Mar. Eng. Technol., 21(3), 146-158. https://doi.org/10.1080/20464177.2019.1704977en_US
dc.identifier.issn2046-4177-
dc.identifier.issn2056-8487-
dc.identifier.urihttp://dx.doi.org/10.1080/20464177.2019.1704977-
dc.identifier.urihttps://www.webofscience.com/wos/woscc/full-record/WOS:000503745400001-
dc.identifier.urihttp://earsiv.odu.edu.tr:8080/xmlui/handle/11489/5124-
dc.descriptionWoS Categories: Engineering, Marineen_US
dc.descriptionWeb of Science Index: Science Citation Index Expanded (SCI-EXPANDED)en_US
dc.descriptionResearch Areas: Engineeringen_US
dc.description.abstractStudies have been being carried out to make production faster and more organised in the shipbuilding industry, as in other industry. The fact that automation-based works are limited in the shipbuilding industry is one of the biggest challenges encountered in block production as in other stages of shipbuilding. The blocks are time-consuming and difficult components to produce in the shipbuilding process. They are the structures formed by joining the cut metal sheets, profiles and other components. These activities are carried out at the different stations of shipyards. Labour planning is one of the crucial issues in shipbuilding. In this study, the allocation of the required capacity during the pre-production stations of the block production, namely C and D, is examined stochastically. The amount of work, revisions and worker performance under uncertainty factors to be experienced in the production process are included in the problem. A two-stage stochastic mathematical recourse model was established to determine the amount of workforce capacity requirement (man*day) of the planning period at the pre-production station depending on the factors. Scenarios are determined randomly and the near-optimum solution was tried to be obtained by the Sample Average Approximation (SAA) approach.en_US
dc.language.isoengen_US
dc.publisherTAYLOR & FRANCIS LTD-ABINGDONen_US
dc.relation.isversionof10.1080/20464177.2019.1704977en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectDESIGN, ASSIGNMENT, SYSTEMen_US
dc.titleA two-stage stochastic model for workforce capacity requirement in shipbuildingen_US
dc.typearticleen_US
dc.relation.journalJOURNAL OF MARINE ENGINEERING AND TECHNOLOGYen_US
dc.contributor.departmentOrdu Üniversitesien_US
dc.contributor.authorID0000-0002-2658-1291en_US
dc.contributor.authorID0000-0002-8077-1686en_US
dc.contributor.authorID0000-0003-3621-0619en_US
dc.contributor.authorID0000-0002-4903-5015en_US
dc.identifier.volume21en_US
dc.identifier.issue3en_US
dc.identifier.startpage146en_US
dc.identifier.endpage158en_US
Appears in Collections:Makale Koleksiyonu

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.