DSpace Repository

A two-stage stochastic model for workforce capacity requirement in shipbuilding

Show simple item record

dc.contributor.author Kafali, Mustafa
dc.contributor.author Aydin, Nezir
dc.contributor.author Genc, Yusuf
dc.contributor.author Celebi, Ugur Bugra
dc.date.accessioned 2024-03-26T06:37:56Z
dc.date.available 2024-03-26T06:37:56Z
dc.date.issued 2022
dc.identifier.citation Kafali, M., Aydin, N., Genç, Y., Çelebi, UB. (2022). A two-stage stochastic model for workforce capacity requirement in shipbuilding. J. Mar. Eng. Technol., 21(3), 146-158. https://doi.org/10.1080/20464177.2019.1704977 en_US
dc.identifier.issn 2046-4177
dc.identifier.issn 2056-8487
dc.identifier.uri http://dx.doi.org/10.1080/20464177.2019.1704977
dc.identifier.uri https://www.webofscience.com/wos/woscc/full-record/WOS:000503745400001
dc.identifier.uri http://earsiv.odu.edu.tr:8080/xmlui/handle/11489/5124
dc.description WoS Categories: Engineering, Marine en_US
dc.description Web of Science Index: Science Citation Index Expanded (SCI-EXPANDED) en_US
dc.description Research Areas: Engineering en_US
dc.description.abstract Studies have been being carried out to make production faster and more organised in the shipbuilding industry, as in other industry. The fact that automation-based works are limited in the shipbuilding industry is one of the biggest challenges encountered in block production as in other stages of shipbuilding. The blocks are time-consuming and difficult components to produce in the shipbuilding process. They are the structures formed by joining the cut metal sheets, profiles and other components. These activities are carried out at the different stations of shipyards. Labour planning is one of the crucial issues in shipbuilding. In this study, the allocation of the required capacity during the pre-production stations of the block production, namely C and D, is examined stochastically. The amount of work, revisions and worker performance under uncertainty factors to be experienced in the production process are included in the problem. A two-stage stochastic mathematical recourse model was established to determine the amount of workforce capacity requirement (man*day) of the planning period at the pre-production station depending on the factors. Scenarios are determined randomly and the near-optimum solution was tried to be obtained by the Sample Average Approximation (SAA) approach. en_US
dc.language.iso eng en_US
dc.publisher TAYLOR & FRANCIS LTD-ABINGDON en_US
dc.relation.isversionof 10.1080/20464177.2019.1704977 en_US
dc.rights info:eu-repo/semantics/openAccess en_US
dc.subject DESIGN, ASSIGNMENT, SYSTEM en_US
dc.title A two-stage stochastic model for workforce capacity requirement in shipbuilding en_US
dc.type article en_US
dc.relation.journal JOURNAL OF MARINE ENGINEERING AND TECHNOLOGY en_US
dc.contributor.department Ordu Üniversitesi en_US
dc.contributor.authorID 0000-0002-2658-1291 en_US
dc.contributor.authorID 0000-0002-8077-1686 en_US
dc.contributor.authorID 0000-0003-3621-0619 en_US
dc.contributor.authorID 0000-0002-4903-5015 en_US
dc.identifier.volume 21 en_US
dc.identifier.issue 3 en_US
dc.identifier.startpage 146 en_US
dc.identifier.endpage 158 en_US


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account